Week 1 Report

What I did

  • Worked on Project Spec/Schedule with the team
  • Discussed direction and design of project with the group.

What I'm doing this week

  • Working on networking between a client and server project.
  • Constructing Config File (Likely XML)
  • Creating logging construct to log all messages passed between client and server(w/timestamp).
  • Making setup executable to modify Config file

What I'm doing next week

  • Finishing whatever I didn't finish this week.
  • Working with the Engine/Logic team to serialize and deserialize objects

Week 2 Report

What I did

  • Created a basic network manager that can send messages from the server to the client

In Progress

  • Managing the closing of connections (and updating the client table)
    • Through explicit close client packets
    • Through implicit could not find client error

What I'm doing this week

  • Working on networking between a client and server project.
  • Constructing Config File (Likely XML)
  • Creating logging construct to log all messages passed between client and server(w/timestamp).
  • Making setup executable to modify Config file

What I'm doing next week

  • Finishing whatever I didn't finish this week.
  • Working with the Engine/Logic team to serialize and deserialize objects